Three-front parallel B&C for the PRP and the IRP

Data from the paper “A three-front parallel branch-and-cut algorithm for production and inventory routing problems” by Cleder M. Schenekemberg, Thiago A. Guimarães, Antonio A. Chaves, and Leandro C. Coelho.

https://www.cirrelt.ca/documentstravail/cirrelt-2022-23.pdf

Instances and detailed results

Results for the OU policy on small and large IRP instances